MY词语>英语词典>subcontracted翻译和用法

subcontracted

英 [ˌsʌbkənˈtræktɪd]

美 [ˌsʌbˈkɑːntræktɪd]

v.  分包; 转包
subcontract的过去分词和过去式

过去式:subcontracted 

柯林斯词典

    The verb is pronounced /ˌsʌbkən'trækt/. The noun is pronounced /sʌb'kɒntrækt/. 动词读作 /ˌsʌbkən'trækt/,名词读作 /sʌb'kɒntrækt/。

  • VERB 将…分包;将…转包
    If one firmsubcontractspart of its worktoanother firm, it pays the other firm to do part of the work that it has been employed to do.
    1. The company is subcontracting production of most of the parts...
      该公司外包了大部分零部件的生产。
    2. They are cutting costs by subcontracting work out to other local firms.
      他们通过将任务转包给当地其他公司来减少成本。
  • 分包合同;转包契约
    Asubcontractis a contract between a firm which is being employed to do a job and another firm which agrees to do part of that job.

    双语例句

    • The project fund for the subcontracted works has been released as scheduled.
      已按计划发放用于分包工程的项目资金。
    • Increase of foreign subcontracted boiler products requires to perfect the quality assurance system.
      涉外锅炉分包产品的增多需完善其质量保证体系。
    • The Contractor shall guarantee that each Subcontractor will execute works subcontracted to him by itself and will have no right to transfer execution of such works to other third parties.
      承包商应保证每个分包商将自己执行其分包的工程,分包商无权将上述工程转包给其他第三方。
    • To many manufacturers of China, which segments should be subcontracted and how to implement outsourcing successfully is more important than whether it should be adopted.
      对于中国许多制造业企业,生产业务外包现在已经不是采用与否的问题,而是哪些应该外包和如何成功实施外包的问题。
    • The car parts are designed here but are subcontracted to another manufacturer to be produced.
      这里设计的汽车零件转包给另一制造商生产。
    • The electrical work has been subcontracted to Smith Ltd..
      电工工作已转承包给史密斯有限公司。
    • This paper provides a quite scientific thought and method for the supplier quality assurance capability assessment in China's subcontracted program, which will be helpful to realize the goals of "High-quality, short time to market, and Low-cost" in commercial aircraft production.
      波音预测未来商务飞机和航空服务市场本文为我国转包生产项目供应商质量保证能力的评定提供了比较科学的思路与方法,为实现民机项目优质、准时、低成本的生产目标打下了基础。
    • The US, though more hawkish than the Europeans, has largely subcontracted the diplomatic heavy lifting.
      美国尽管比欧洲更为鹰派,却基本上把外交重任委托他人。
    • The site of the subcontracted works is in brazzaville, Republic of congo.
      分包工程场地位于刚果共和国布拉柴维尔。
    • The overall contractors and subcontractors shall bear joint responsibilities to project owners for the subcontracted projects.
      总承包单位和分包单位就分包工程对建设单位承担连带责任。