estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- Annotate the problem query with relevant statistics to better understand what the DB2 optimizer is using for its estimations.
使用相关统计数据来注释有问题的查询,这样可以更好地理解DB2使用哪些内容来进行评估。 - In this paper, estimations of varying-coefficient models with the correlated random errors are given by the local linear method. Furthermore, its asymptotical formalities are discussed.
在误差相关的情况下,使用局部线性方法给出变系数模型的估计,并讨论估计的渐近正态性。 - Finally, the estimations of the two-dimensional ( 2-D) transmit-receive central azimuths are obtained by using the property.
最后,利用该特性得到了对目标2维收发中心方位角的估计。 - Prepare detailed written reports that estimate property values, costs, outline methods by which the estimations were made, and meet appraisal standards.
准备详细的书面报告,估计属性值,成本,概述的方法,估算了,并满足评价标准。 - Parameter Maximum Likelihood Estimations from Incomplete Data in Generalized Linear Models
不完全数据广义线性模型参数的极大似然估计 - Non-parametric estimations reveal that the fat tail of the distribution of stock return satisfies power law decay.
非参数估计显示股票收益分布的非正态性及肥尾现象,其尾部满足幂律衰减。 - Parameter Estimations of Multi-Dimensional Correlation Coefficient Stationary Series Based on MCMC
基于MCMC的多维相关系数平稳序列 - One could then focus on the fundamentals as projected by the earnings estimations.
然后可以将重点定位在盈利预测基本因素上。 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。 - Statistical Comparisons on Parameter Estimations in Electromigration Tests
电迁移测试中模型参数估计方法的比较